

The solution also resulted in the reduction of the number of controller working displays and controller input devices. NCATMB wanted to maximise use of available tower space and provide easy information access for all tower users in English and Chinese language as required. This was a complex engineering program, completed over 12 months, seamlessly integrating the tower controller and supervisor working positions into a common user environment. Earlier versions of TIMS™ have been installed in the German DFS international and domestic towers and control centres since 1993.
#Tims air navigation simulator software#
TIMS is the Avitech Integrated Tower Information Management System software now in its fourth engineering generation. On the 29 th of April 2006 the site acceptance test was formally finalized and the complex integration project successfully completed. TIMS was delivered with even more functionality than specified.

Linfair and Avitech installed TIMS™ in close cooperation with NCATMB and with skilful engineering from all parties. Linfair Engineering, a systems integrator based in Hong Kong, and Avitech AG Germany, it’s ATM systems software partner, have successfully completed final acceptance and commissioning into operational use of the Tower Information Management System (TIMS) procured by North China Air Traffic Management Bureau (NCATMB) for the Beijing Capital Airport main control tower. ::: Successful DMAN workshop in Beijing!. The platform of SQM provides not only the manual-free operation, but also its LBR can be easily upgraded for production of HD-DVD and BD in the future without the need of purchasing a whole new line.
#Tims air navigation simulator manual#
The laser beam recorder (LBR) of SQM does not required manual alignment and the life time of laser is extended by a special modulation method.ģ. The round conveyor transportation system ensures the glass substrates are moving smoothly between in-line stations including cleaning, photo-resist dosing, baking, laser beam recording, developing, and testing.Ģ. The glass substrate was loaded and unloaded automatically. Fully automated mastering system with self contain clean room environment. Customer is satisfied with its performance and the final acceptance was executed right after the pilot run of this system. As the installment of SQM CD/DVD line at Jin-Cheng-Chao in Guangzhou, China successfully done by Linfair Engineering, SQM mastering system has set it own reputation of being a compact, fast and unique machine in China with other 15 installment around the world including 2 HD-DVD LBRs.
